Module pre-assembly limits final assembly downtime to only 10 hours
Project:
Englewood HospitalLocation:
Englewood, NJProduct:
Fully Custom CTM-TB Series Custom Air HandlersWhen an existing unit had surpassed its life expectancy, and a straight replacement was rejected because of excessive unscheduled downtime, Englewood Hospital turned to Mainstream for a solution. A CTM-TB series unit was supplied in easy-to-assemble modules, along with a custom fabricated stand to facilitate installation.
Intake and discharge openings were also laid out to exactly match the existing conditions, greatly simplifying the installation. The unit was pre-assembled in the mechanical room prior to final assembly in-place to minimize downtime. Once this had been done, the unit was installed in less than a 10-hour time frame.