Custom AHU units on-site only 6 weeks after go-ahead


Project:

Really Cool Foods

Location:

Cambridge City, IN

Product:

Fully Custom CTM Series Air Handlers

The customer had an emergency tight timeline to replace its failed units. The required AHUs required indirect-fired gas heating, two stages of chilled water cooling coils and thermal-break construction. The best lead time available from other manufacturers was 16 weeks. Mainstream proposed a completion schedule less than half that of anyone else, and received the contract. The Mainstream team designed and manufactured the fully custom air handling units on a six-week production cycle.

The installing contractor was able to install the units and have them commissioned in time to prevent any delays to the project schedule.
Completed custom rooftop units arrive on site after a 6-week production cycle.
Completed custom rooftop units arrive on site after a 6-week production cycle.